William Weidner, P.E., CEO of Weidner Consulting and Louisiana-licensed petroleum engineer

William Weidner, P.E., Chief Executive Officer

William Weidner is the CEO of Weidner Consulting and a petroleum engineer licensed in Louisiana (PE #37752), with experience across drilling, completions, workovers, P&A, and production.

He spent ten years at Crescent Drilling & Production, becoming VP of Engineering and Partner, where he designed and supervised wells for clients across Louisiana and the Gulf South and mentored young engineers. He later served as Senior Project Engineer at Upstream Exploration / Southern Oil of Louisiana. Since 2016 he has also owned and operated producing fields, which gives him an operator’s view of cost, risk, and regulatory work.

William earned his B.S. in Petroleum Engineering from LSU in 2008. He has served on the national board of the American Association of Drilling Engineers, including as National Vice President in 2020, and is a member of the Society of Petroleum Engineers.

Track record

Since 2008, William has designed, drilled, completed and worked over wells for operators across Louisiana, Texas, Mississippi, Ohio and the Gulf of Mexico, from inland barges and state waters to the offshore shelf.

75+ wells and workovers · $275MM+ in capital programs · 19 operators

Selected projects

  • Designed and drilled a 17,325' HPHT well in Breton Sound, the fastest well drilled in the field

  • Designed and drilled a 19,400' HPHT wildcat in West Baton Rouge, also the fastest in the field

  • Designed and drilled a 16,200' HPHT well in the Vermilion Block 16 area

  • Horizontal wells with 1,000'–5,000' of lateral displacement in West Baton Rouge

  • Horizontal drilling with open-hole gravel packs in Breton Sound, delivering ~1,500 BOPD completions

  • Detailed plans and AFEs for two sub-salt wells to ~25,000' and ~30,000'

  • Managed a 20-well field workover program in Grand Bay

  • HPHT workover that restored production to ~1,500 BOPD and ~15 MMCFPD

  • Returned a well shut in for 3+ years to 100+ BOPD with a through-tubing plug back from a liftboat

  • Used hydraulic workover units to revive a well shut in for 10+ years and to convert a well to SWD, keeping the Breton Sound field online

  • Land rig on barges to sidetrack and drill a well in Lake Fausse Pointe

  • Estimated P&A liability and drilling AFE for a large offshore platform to support its sale to a large independent

  • Deep-well management with Managed Pressure Drilling equipment

Industry leadership

  • AADE National Board Vice President (2020) and Secretary (2018–2019)

  • AADE New Orleans Chapter President (2015)

  • Member, Society of Petroleum Engineers and National Society of Professional Engineers

Map of Weidner Consulting well projects across Louisiana, Texas, Mississippi, Ohio and the Gulf of Mexico

Map data © OpenStreetMap contributors

Tell us about your project.